Now it's done: The previously separate race by building walls on both sides to the bridge is the main and farm buildings connected. To perform the necessary transformations, to 18 and 19 January, the walls are torn down and replaced in part by mobile security precautions.
But do not worry, it will be cold so not because the bridge is now sealed and heated. Minor problems are to be expected if all of the craftsmen who set the lines and have to lay carpet.
0 comments:
Post a Comment